Shed builders in Canberra

Garages, workshops and sheds, built by an actual builder

Sheds for homes and businesses across Canberra and the NSW side of the border. We do the slab, the engineering, the approvals and the build. Not a kit on a truck and a phone number.

  • Licensed builder, ACT 2023538 and NSW 499527C
  • Slab, engineering and approvals included
  • Homes and businesses
Short answerUpdated

We build garages, workshops, storage sheds and commercial sheds across Canberra and the surrounding NSW towns. Unlike a kit supplier, we handle the slab, the engineering, the approvals and the build as one licensed builder. Most home sheds take 2 to 6 weeks on site, slab included, and we can fit out an office or amenities inside a commercial shed in the same job.

Home or business?

Sheds for your home and your business

Pick your side. Both get the same licensed team, with the slab, engineering and approvals included.

Home sheds and garages

Garage

Double garage

Matched to your house colours, with the slab, roller doors and power worked out up front.

Workshop

Home workshop

Insulated, powered and properly lit, with room for the benches, the machines and the storage.

Storage

Storage shed

For the trailer, the boat, the garden gear, or everything that's slowly taken over the garage.

Caravan and boat shed

High doors and long bays for caravans, boats and motorhomes.

Building a house as well? We can put up the house and the shed under one contract, in matching colours. House and shed packages

Commercial and industrial sheds

Trade

Trade and industrial workshops

Clear spans, high eaves, wide roller doors and a slab made for heavy loads.

Storage

Warehouses and storage

Clear-span storage with mezzanines, room for racking and proper loading access.

Farm and machinery sheds

Machinery, hay and equipment sheds on rural blocks around Yass, Bungendore and Murrumbateman.

Combo

Shed with an office inside

We build the shed and fit out the office, amenities or showroom inside it, in one quote.

Kit or builder?

What you get with a builder-built shed

A kit looks cheaper on paper. Then you add the engineering, the approval, the slab, the installer and the electrician. Here's how they stack up.

Kit shedConstruction Xperts
Steel frame and claddingSuppliedSupplied and built
Engineering for your siteSometimesIncluded
ApprovalsUsually up to youChecked and lodged
Slab and footingsUp to youIncluded
Putting it upYou, or a separate installerIncluded
Power, insulation, mezzanineUp to youAvailable
Office or amenities insideNot offeredSame team does it
Who answers if something's wrongDepends who you askOne licensed builder
For businesses

The shed and the office inside it, in one quote.

Usually you'd hire a shed company for the building, then go looking for someone else to do the office, the lunchroom and the toilets. We do the lot on one programme, so the place is ready to work in the day we hand it over.

  • Plumbing, power and data planned before the slab goes down
  • Mezzanines, amenities and showrooms in the same job
  • One licensed builder answering for all of it
01 Commercial shed
02 Office fit-out inside
Local know-how

Shed rules change at the border

Whether you need approval depends on which side of the border you're on, the size of the shed and where it sits on the block. Send us your address and we'll tell you.

ACT

Sheds are Class 10a buildings

In the ACT, a shed or garage is a Class 10a building. Its size, height, setbacks and your block's solar envelope decide whether it can skip development approval. Plenty still need building approval from a certifier.

Source: ACT Planning, garages, sheds and gazebos

NSW

Small sheds can be exempt

Over the border, a small shed can be exempt development if it meets the state limits: around 20 m² in residential zones and 50 m² in some rural zones, with height and setback rules. Bigger sheds need a CDC or a DA, and farm buildings have their own path.

Source: NSW Planning, exempt and complying development

Wind

Every shed is engineered for its site

Steel sheds are designed for the site's wind region, terrain and importance level. A shed on an exposed hilltop near Yass needs a stronger frame than one tucked behind a house in Kambah, and the paperwork comes with yours.

Slab

The slab depends on what goes in it

A domestic garage slab is often around 100 mm with mesh. A workshop with a hoist, heavy machinery or trucks needs something thicker with more steel. The engineer sets it, and it's in your price.

The spec

Built to your spec, not picked from a brochure

Uses
Garages, workshops, storage, warehouses, trade and industrial buildings
Frame
Engineered steel portal frames, sized for your span and site
Roof
Gable, skillion or barn
Doors
Roller, sectional, sliding and personal access doors
Engineering
Designed for the site's wind region, terrain category and importance level
Slab
Designed for the shed and what's going in it, up to heavy vehicles and machinery
Options
Insulation, skylights, whirlybirds, mezzanine floors, power and lighting
Inside
Office, amenities and showroom fit-outs by the same team
How it works

From empty block to shed in six steps

  1. Site visit

    We check access, levels, setbacks, power and the best spot for the shed.

    Week 1
  2. Design and engineering

    Size, doors and colours locked in, with engineering for your site's wind and soil.

    1 to 3 weeks
  3. Approvals

    We confirm whether it's exempt or needs approval, and lodge it if it does.

    Up to 8 weeks, if needed
  4. Slab and footings

    Excavation, formwork and a slab made for the shed and what's going in it.

    1 to 2 weeks
  5. Frame and cladding

    Frame, walls, roof, doors, gutters, plus any insulation or skylights.

    1 to 4 weeks
  6. Fit-out and handover

    Power, lighting, mezzanines or an office fit-out, then a walk-through together.

    1 to 6 weeks
Costs

What decides what a shed costs in Canberra

Shed prices mostly come down to the size, the height, the doors and the slab, and every site is different. So we quote each shed installed, slab included.

ShedWhat decides it
Garage, 6 × 6 mDoors, the slab and the slope of the block
Workshop, 9 × 12 mHeight, doors, insulation and power
Commercial shedBy span and eave heightSpan, eave height, wind rating and the fit-out inside
Kit only, no slab or installFor comparisonSteel only. The slab, engineering, approval and build are extra

Every price is worked out for your site and your inclusions. The quote and the first site visit are free.

Projects

Sheds we've built

Each with the size, eave height, doors and slab, plus a few words from the owner. No stock photos.

Photos coming
ProjectWorkshop shed
SuburbTBC
FileCX-02

Dimensions, eave height, doors and slab, plus a few words from the client.

Photos coming
ProjectCommercial shed and office
SuburbTBC
FileCX-08

The shed, the office and amenities inside it, and how long the whole job took.

On every job

The owner is on site for every job we build.

40 to 50 jobs a year, mostly sheds, plus a couple of homes

Photos of recent jobs are on the way. Ask us for photos of work like yours.

FAQ

Questions about sheds and garages

Do I need approval to build a shed in the ACT?

Often, yes. Sheds and garages are Class 10a buildings. Some can skip development approval if they meet the size, height, setback and solar envelope rules for your block, but many still need building approval. We check your block and tell you which path applies.

Do I need council approval for a shed in NSW?

Small sheds can be exempt in NSW if they stay within the state limits, which are around 20 m² in residential zones and 50 m² in some rural zones, with height and setback rules. Bigger sheds need a CDC or a DA. Farm buildings have their own exempt path.

Why use a builder instead of buying a shed kit?

A kit is just the steel. You still need engineering, approval, a slab, someone to put it up and someone to answer for it if something goes wrong. We handle all of it as a licensed builder, with one price and one person to call.

How thick does a shed slab need to be?

It depends what's going in it. A domestic garage is often around 100 mm with mesh, while a workshop with heavy machinery or vehicles needs a thicker slab with more steel. The engineer specifies it for your shed.

Can you match the shed to my house?

Yes. Walls, roof, trims and doors can all be picked from the Colorbond range to match or sit nicely with your house.

What wind rating does my shed need?

Every shed has to be engineered for the site's wind region, terrain category and importance level. Exposed rural and hilltop sites need a stronger design. It's all part of the engineering we do for your shed.

Can you put an office inside a commercial shed?

Yes. We do commercial fit-outs too, so we can build the shed and fit out the offices, kitchen, toilets or showroom inside it, all quoted together as one job.

How long does it take to build a shed?

Once any approvals are through, most home sheds take 2 to 6 weeks, slab included. Commercial sheds take longer depending on the size and the fit-out.

Tell us what you want to park, store or build in it.

We'll check your block, tell you about approvals and give you an installed price with the slab included.

CallGet a quote