Cost guide, 2026

How much does an office fit-out cost in Canberra?

What decides the price of a fit-out, and where you can save without it looking cheap. Written by the Construction Xperts team, last checked 26 October 2026.

Short answerUpdated

It depends on the space you're starting with and the inclusions you choose. The number of rooms, the joinery, changes to air conditioning, power and data, and how much work has to happen after hours move the price the most. Refreshing an office you are already in can cost far less than a new fit-out. We walk the space for free and give you an itemised quote and a programme to your opening date.

What moves the price

FactorWhy it matters
Starting conditionAn empty shell needs far more than an office with usable ceilings, lighting and air-conditioning.
Rooms versus open planEvery office, meeting room and partition adds walls, doors, ceilings and services.
Joinery, kitchens and amenitiesReception counters, kitchens and accessible toilets are among the bigger items.
ServicesChanges to air-conditioning, power, data and fire services by licensed trades.
When the work happensAfter-hours and weekend work keeps you trading but costs more.
Landlord and building rulesDesign criteria, approved contractors and building rules affect methods and materials.

Costs people forget to budget for

  • Design and documentation if you do not have drawings
  • Landlord review fees and building approval
  • Fire services and air-conditioning changes
  • Furniture, IT equipment and signage
  • After-hours work and building access charges
  • Make good at the end of the lease

What a fit-out budget covers, and what usually sits outside it

Usually in the fit-outOften separate
Walls and ceilingsPartitions, glazing, doors and ceilingsFurniture and IT
FixturesJoinery, kitchens and amenitiesSignage manufacture
FinishesFlooring and paintingLandlord and authority fees
ServicesPower, data, lighting, air-conditioning and fire changesMake good at lease end

Why Canberra costs more

Market

The dearest fit-out market in Australia

Industry guides point to construction costs, a tight labour market and the standard expected by government and professional tenants. That's why we break every quote down line by line.

Source: Cushman & Wakefield, Australian office fit-out cost guide

Timing

Start early, save money

Rushing to make an opening date means overtime, after-hours premiums and paying more for materials that can be delivered fast. Giving the job a sensible programme is one of the cheapest savings there is.

How to keep your fit-out on budget

  • Use what is already there. Keeping usable ceilings, lighting and air-conditioning saves the most.
  • Go open plan with a few well placed rooms instead of lots of small offices.
  • Lock in the design before pricing, so the quote is not full of allowances.
  • Start early, so you are not paying for rush work to make an opening date.

Questions people ask about fit-out costs

Why is Canberra so expensive for fit-outs?

Industry guides point to construction costs, labour availability and the standard expected by government and professional tenants. That is why clear, itemised pricing matters so much here.

What is the difference between Cat A and Cat B?

Cat A is the landlord's base build: ceilings, lighting, air-conditioning and floor finishes. Cat B is everything that makes it your space, like partitions, meeting rooms, kitchens and joinery.

How long does a fit-out take?

Small offices and shops often take 3 to 6 weeks on site, and larger fit-outs 8 to 12 weeks or more, plus design and approvals before that.

Can a fit-out happen while we keep trading?

Often, by staging the work and moving noisy jobs after hours. It adds some time and cost but saves closing your doors.

A guide only. This is general information, not a quote or financial advice. Your price depends on your design, your site and what you choose.

Ready to price your space?

Book a site meeting. We'll walk the space, read the lease requirements and give you an itemised quote and programme.