Six clear steps, whatever we're building
You'll always know what stage you're at, what happens next and when you'll hear from us. Here's the shape of every job, what you get at each step, and the rules that protect you along the way.
- Chat
- Site visit
- Design and quote
- Approvals
- Build
- Handover
Every Construction Xperts job follows the same six steps: a free chat, a site visit, design and an itemised quote, approvals, the build, and handover. You get a written programme before you sign, one point of contact the whole way through, and progress payments tied to finished stages of work. An independent certifier checks the work at set stages, in the ACT and in NSW.
The same six steps, start to finish
The whole programme, at a glance. Tap any step to see where it sits. The times are typical, and yours are set out in writing before you sign.
Have a chat
A free chat about what you want to build, where, and roughly what you'd like to spend.
Week 1Site visit
We come out, walk the block or the tenancy and tell you honestly what's realistic.
Weeks 1 to 2Design and quote
Plans, engineering and an itemised quote you can hold up against anyone else's.
2 to 10 weeksApprovals
We lodge the ACT or NSW approvals and handle the landlord and certifier sign-offs.
Depends on the jobBuild
Regular updates, site meetings when they're useful and no nasty surprises.
Weeks to monthsHandover
A final walk-through together, then certificates, keys and your warranty paperwork.
1 to 2 weeks
What you have in hand, and what's your call
Each step ends with something you can hold, and a decision that's yours to make. Nothing moves on until you're ready.
The detail for your project
Pick your kind of job. These are typical times, and your own programme comes in writing before you sign.
New homes
Have a chat
We talk about your block, what you want, your budget and when you'd like to move in. We'll tell you what's doable for that budget.
Week 1Site visit
We walk the block, order the soil test and contour survey, and check access, slope and where the services are.
Weeks 1 to 3Design
Your own plans adapted to the block, or a fresh design with our drafting partner. The energy rating gets sorted here too.
4 to 10 weeksQuote and contract
An itemised quote with inclusions, allowances and site costs on separate lines. Take your time with it and ask us anything.
2 to 4 weeksApprovals
Building approval in the ACT, or a CDC or DA in NSW, plus any estate sign-off. We lodge it and chase it.
4 to 12 weeksBuild and handover
Slab, frame, lock-up, fixing and finishes, with updates at every stage. Then a walk-through together, the keys and your warranty papers.
9 to 14 months
Knockdown rebuilds
Feasibility visit
We walk through the house and the block, check zoning, easements, trees and heritage, and give you a realistic budget.
Weeks 1 to 2Design
A new home designed for your block, your street and the way you live now.
6 to 12 weeksQuote and contract
One itemised price covering the asbestos, demolition, site costs and the new build.
2 to 4 weeksApprovals
Building approval in the ACT, or a CDC or DA in NSW, demolition included. We lodge it and chase it.
6 to 16 weeksOut with the old
Services cut off, asbestos removed and cleared, the house demolished and the block cleared for the slab.
3 to 6 weeksBuild and handover
Your new home goes up, with updates every step of the way. Then a walk-through together and the keys.
8 to 12 months
Renovations and extensions
On-site visit
We look at the house, listen to what you want and talk through what it might cost.
Week 1Measure and concept
A measured survey of the house and a concept design, with an early cost check before you go further.
3 to 6 weeksEngineering and quote
Structural engineering, the energy assessment and an itemised quote you can compare line by line.
3 to 5 weeksApprovals
Building approval or exemption in the ACT, or a CDC or DA in NSW. We lodge it and chase it.
4 to 12 weeksBuild
The new part goes up first where it can, then gets joined to the house, so you're living around it for the shortest time.
3 to 6 monthsHandover
A walk-through together, anything not right gets fixed, then the certificates and warranty papers.
1 week
Sheds and garages
Site visit
We check access, levels, setbacks, power and the best spot for the shed.
Week 1Design and engineering
Size, doors and colours locked in, with engineering for your site's wind and soil.
1 to 3 weeksApprovals
We confirm whether it's exempt or needs approval, and lodge it if it does.
Up to 8 weeks, if neededSlab and footings
Excavation, formwork and a slab made for the shed and what's going in it.
1 to 2 weeksFrame and cladding
Frame, walls, roof, doors, gutters, plus any insulation or skylights.
1 to 4 weeksFit-out and handover
Power, lighting, mezzanines or an office fit-out, then a walk-through together.
1 to 6 weeks
Commercial fit-outs
Site meeting
We walk the space with you, read the lease requirements and talk programme and budget.
Week 1Scope and design
We build to your designer's drawings, or coordinate the design for you.
2 to 6 weeksQuote and programme
An itemised quote and a week-by-week programme to your opening date.
1 to 3 weeksApprovals
Landlord sign-off, building approval and services design, all coordinated.
2 to 8 weeksBuild
Partitions, ceilings, joinery, services and finishes, after hours where it's needed.
3 to 12 weeksCertify and hand over
Final inspections, certificates and a space that's ready to trade.
1 to 2 weeks
Typical times. Your own programme comes in writing, before you sign anything.
The rules that protect you
We build on both sides of the border, and the rules aren't the same. Here's what the law says, in plain English.
Plain-English summary, checked October 2026. It isn't legal advice, and rules change, so check the current rules for your job. Sources: ACT residential building work insurance, ACT statutory warranties and insurance, NSW contracts for residential building work, NSW Fair Trading Consumer Building Guide.
You pay as the work gets done, never ahead of it
For a new home, payments usually line up with these stages. Each one is a finished piece of work you can walk out and see.
- DepositContract signed and insurance in place
- BaseSlab poured or floor system down
- FrameWall and roof frames up and inspected
- Lock-upRoof on, walls clad, windows and doors in
- FixingLinings, cabinets and fit-off underway
- CompletionFinished, walked through and signed off
The bars show how far the build has come, not how big each payment is. The stages and amounts are set out in your contract before you sign. Extensions, sheds and fit-outs use fewer, simpler stages.
How you stay in the loop
Building is stressful enough without wondering what's going on. This is what you get from us, on every job.
One person, one number
The same person from the first visit to handover, with a direct number that they actually answer.
Photos at every stage
A progress update with photos at each stage, and site meetings at the milestones that matter.
Payments you can predict
Progress payments tied to clear stages in your contract, and never ahead of the work.
Variations in writing first
If something needs to change, you'll see the cost and the time it adds in writing before any work is done.
Bad news early
Rain, supply or approval delays happen. You'll hear about them from us the day we know, with a revised programme.
A proper walk-through
We go through everything together, fix anything that's not right, and hand over every certificate and warranty.
You should never have to ring a builder to find out what's happening on your own job.How we run every build
Questions about how we work
How do progress payments work?
You pay in stages as the work is done, as set out in your contract. For a new home that's usually a deposit, then slab, frame, lock-up, fixing and practical completion. You never pay ahead of the work.
Who checks the work during the build?
An independent certifier. In the ACT you appoint a licensed building certifier, who issues the building approval and inspects the work at set stages. In NSW the principal certifier does the critical stage inspections, including the footings, the frame before it's covered, wet area waterproofing and the final.
Does my builder need insurance before starting?
Yes, for most jobs. In the ACT, a new home and most structural alterations of $12,000 or more need residential building work insurance or a fidelity certificate. In NSW, residential work over $20,000 needs home building compensation cover. Your builder must give you the insurance certificate, and you shouldn't pay the deposit until you've seen it.
What happens if I want to change something during the build?
We'll write up a variation showing the cost and any time it adds. Nothing changes until you've signed it.
How often will I hear from you?
At every stage, with photos, and any time something changes. You've also got a direct number for your contact if you want to check in.
What happens at handover?
We walk through the finished job with you, fix anything that's not right, then hand over the keys, the certificates and your warranty paperwork.
Step one is a free chat.
Tell us roughly what you want to build and where. We'll ring you to talk it over, usually the same day.