Home extensions and renovations in Canberra

More room, a better layout, and you get to stay where you are

Ground floor extensions, second storeys and whole-home renovations, planned so the new part looks like it was always there. One licensed team from the first measure-up to the final clean.

  • Licensed in the ACT and NSW, ACT 2023538 and NSW 499527C
  • Engineering and approvals sorted for you
  • We call back within one business day
Short answerUpdated

What an extension costs comes down to its size, whether it has a kitchen or bathroom, and whether you build out or up. Second storeys cost more because of the structure, stairs and roof. Most extensions take 3 to 6 months on site once the approvals are in, and many families stay in the house for most of it.

Is this you?

Why people extend instead of moving

Stamp duty, agent fees and moving costs add up fast. For a lot of families, the money goes further spent on the house they've already got.

01

You need another bedroom or two

A new baby, a home office, or parents moving in. Add the rooms without changing suburbs or schools.

02

You want the living areas opened up

Take out walls, open the kitchen to the garden and get light into the back of the house.

03

There's no room to build out

Go up instead. A second storey adds space without giving up the backyard.

04

The whole house feels tired

A full renovation sorts the layout, kitchen, bathrooms and energy use in one go, so you're not living in a building site three times.

Out or up?

Ground floor extension or second storey?

Most people start here. The short version: building out is cheaper if you've got the yard for it, and building up keeps the yard but costs more and usually means moving out for a while.

Compare the costs side by side

Ground floor extensionSecond storey addition
Best whenYou've got yard space to spareThe block is small or you want to keep the yard
Cost per m²LowerHigher, roughly 50% more (structure, stairs, roof)
Living at homeUsually fine for most of the buildOften need to move out once the roof comes off
ApprovalsSetbacks and site coverage are the main checksHeight, overshadowing and privacy get checked too
EngineeringNew footings and tying into the roofThe existing walls and footings get checked first
What we build

Extensions and renovations we take on

Ground floor extensions

Extra bedrooms, a bigger kitchen or a family room out the back, matched to the house you've got.

Second storey additions

Go up and keep the yard. We handle the engineering, the approvals and the scaffolding.

Whole-home renovations

A new layout and new finishes inside your existing walls, with the energy upgrades done while the walls are open.

Kitchens and bathrooms

As part of a bigger renovation, or on their own.

Age-in-place changes

Wider doorways, step-free entries and safer bathrooms, so you can stay put for longer.

Local know-how

Approvals on each side of the border

The rules are different in the ACT and NSW, and that changes how long things take before we can start. Send us your address and we'll tell you which path you're on.

ACT

Most extensions need building approval

In the ACT a private building certifier signs off the plans before work starts. Smaller extensions that meet the exemption rules on size, height and setbacks can skip development approval. Bigger ones, or ones that don't tick every box, need a DA first.

Source: ACT Planning, check if you need a DA

NSW

Exempt, CDC or DA

Over the border in Queanbeyan, Googong, Bungendore or Yass, small works can be exempt. An extension that meets the state's standard rules can go through a CDC with a private certifier, often within a few weeks. Anything else needs a DA through the local council.

Source: NSW Planning, complying development

Older homes

Built before 1990? Test for asbestos

Older Canberra houses often have asbestos in the eaves, the wet-area walls or under the lino. We get it tested before we quote, and a licensed removalist takes out anything we'd disturb.

Energy

Upgrade while the walls are open

An extension is the cheapest time to add insulation, double glazing and a heat pump. We'll show you which upgrades pay for themselves and which ones don't.

How it works

How an extension comes together

Typical times. You'll get your own programme in writing before you sign anything.

  1. On-site visit

    We look at the house, listen to what you want and talk through what it might cost.

    Week 1
  2. Measure and concept

    A measured survey of the house and a concept design, with an early cost check before you go further.

    3 to 6 weeks
  3. Engineering and quote

    Structural engineering, the energy assessment and an itemised quote you can compare line by line.

    3 to 5 weeks
  4. Approvals

    Building approval or exemption in the ACT, or a CDC or DA in NSW. We lodge it and chase it.

    4 to 12 weeks
  5. Build

    The new part goes up first where it can, then gets joined to the house, so you're living around it for the shortest time.

    3 to 6 months
  6. Handover

    A walk-through together, anything not right gets fixed, then the certificates and warranty papers.

    1 week

More about how we work

Costs

What decides what an extension or renovation costs in Canberra

What decides the price, so you can see where your budget goes. Your actual quote depends on the house, the design and the finishes you pick.

What you're doingWhat decides it
Ground floor extensionSize, finishes and the join to the existing house
Second storey additionNew structure, stairs and roof, so it costs more per square metre than building out
Kitchen or bathroom as part of the jobWet areas cost the most per m²Priced on what's in it
A tricky site or an older houseAccess, slope, asbestos and matching what is already there

Every price is worked out for your site and your inclusions. The quote and the first site visit are free.

The details

What makes an extension look like it was always there

You can usually spot a cheap extension from the street. These are the things we sort out on paper, not on site.

01

Rooflines that carry on

Same pitch, same overhang, same gutter line, so the new roof reads as part of the old one.

02

Bricks that match

Colour, size and bond. When the old brick isn't made any more, we find the closest match or design a deliberate contrast.

03

No step at the join

Floor and ceiling heights lined up, so you walk from old to new without noticing.

04

Honest advice

We do knockdown rebuilds too. If renovating isn't good value for your house, you'll hear it from us first.

Projects

Extensions we've built

Each with the before and after, the size, how long it took and whether the family stayed home through it. No stock photos.

Photos coming
ProjectSecond-storey extension
SuburbTBC
FileCX-01

The size, how long it took, the budget band and the approval path, with before and after photos.

Photos coming
ProjectGround floor family room
SuburbTBC
FileCX-07

A rear extension: the size, the time on site, and how the family lived around the build.

On every job

The owner is on site for every job we build.

40 to 50 jobs a year, mostly sheds, plus a couple of homes

Photos of recent jobs are on the way. Ask us for photos of work like yours.

FAQ

Questions about extensions and renovations

How much does an extension cost in Canberra?

It depends on the size, whether it includes a kitchen or bathroom, the finishes and the site. Second storeys cost more because of the structure, stairs and roof. We look at the house for free and give you an itemised quote. Our cost guide breaks it down.

Do I need approval for an extension in the ACT?

Almost always you'll need building approval from a certifier. Smaller extensions that meet the exemption rules can skip development approval, while bigger ones need a DA as well. We check your block and lodge whatever's needed.

Can we live in the house during the renovation?

Often, yes, especially with ground floor extensions, where we build the new rooms first and join them to the house near the end. For second storeys and whole-home renovations you'll probably need to move out for part of it. We'll plan that with you up front.

How long does an extension take?

Most extensions take 3 to 6 months on site once design and approvals are done. Second storeys and whole-home renovations usually take longer.

Can my house take a second storey?

Many can, but it depends on the footings, walls and roof you've got now. A structural engineer checks it early, before you pay for a full design.

Will the extension match the rest of the house?

That's the whole idea. We track down matching or complementary bricks, roofing and windows, and line up the floor and ceiling heights so the old and new join cleanly.

What about asbestos in an older home?

Houses built before 1990 can have asbestos in the eaves, wet-area walls and flooring. We arrange testing before we quote, and a licensed removalist takes out anything the work would disturb.

Can we do it in stages to spread the cost?

Yes. Some jobs split nicely, like the extension now and the kitchen later. We design the first stage so nothing has to be pulled apart for the second.

Need more room? Let's have a look at the house.

We'll come out, measure up, and tell you whether going out or up makes more sense for your house and your budget.

CallGet a quoteReno vs rebuild